We have successfully executed a 444 mld (x 140 m) Floating Pumping Station, based on Aqua's 1005 hp x 3.3 kV SubCF pumpsets, for the World's Largest Integrated Renewable Energy Project (IREP) with up to 1680 MW of Reversible Pump Turbines.
In less than 60 days from notification by m/s NTPC; Aqua commissioned 1250 m³/hr x 100 m 600 hp SubCF pumps mounted on the pontoons.
The 50mld, m/s GWIL Macchu Dam-based Water Supply System (WSS) operates satisfactorily, 24 x 7 x 365 days a year, using Aqua's SubCF pumps since 6years now.
1800 m³/hr Aqua make SubCF pumpsets mounted on the pontoons were commissioned in just 28 days to supply water to MIDC Rajangaon.
For it's Sukinda Chromite mine dewatering, m/s Tata Steel has replaced HSCF pumpsets by Aqua's 140 m, 3.3 kV Submerged pumps mounted on pontoons.
We completed a 278mld submerged pump-based pontoon pumping station for m/s Maharashtra Water Resources Department's Jigaon Lift Irrigation Scheme (LIS 7A & 7B) on the Purna River in just 40 days.
We have executed a submerged pump-based Pontoon PS on the Rihand River for Uttar Pradesh's SWSM Jhilo WSS.
The Nabinagar Thermal Power Station relies on Aqua's floating pumping station & Submerged pumps for it's Raw water intake from the Sone River since nearly 7 plus years.